Kuzey Kıbrıs Turkcell has opened a solar power plant built on a 10-acre site in Vadili, Famagusta district.
The facility, consisting of 2,500 high-efficiency panels and nine power plant inverters, is the 8th largest solar power plant in the TRNC.
The total cost of the solar power plant, which produces 900 kWp, cost around 6 million Turkish Lira.
BRT